A Few Days of Hard Labour at Patan, Lonavala

When asked if I would join this JCWP project, I naturally jumped at the chance. I had no idea at the time that 2000 volunteers would be taking part! Come to think of it, we probably need those numbers if we’re going to try and build 100 homes within a week!

And the architect in me is still sceptical that it can be done. It’s quite possible, I’m sure, when you’re working with wood-frame construction but, here it’s all masonry (the website talks of concrete block) – that too with so many amateurs around.

I just hope I’m totally wrong.

Twin Bungalows at Nasrapur

The Pej river in spate on 26th July 2005 On the 26th of July last year, when I first visited Nasrapur to look at a proposed bungalow site, the Pej river was in spate and the bridge (South-West corner of the satellite picture) was at least 2m underwater. I had to be content with looking at the trees (highlighted in the photo) from across the flood.

Designing began early this year and excavation started about 4 months ago but the rains soon came down and washed away the approach road. Now, with the monsoon finally receding, we’ll be going full steam ahead.

Turbine on the Roof

Oh, this is good! A company that mainly develops unmanned aircraft has turned its skills to making rooftop wind turbines. Small and light (no price yet so I don’t know if it’s cheap) and mounted on the building parapet – to make best use of the structure’s aerodynamic properties – it requires only 3.1m/s of wind-speed to work. That’s a huge drop from the 12m/s average for larger windmills.

Full article :: EcoGeek at Wired NextFest